Achieve by date: September 2022
-The University has made a huge investment in the renewable energy sector. The project is scheduled for final commissioning by November 2023. Currently it has an installed capacity of 500 kWp which represents 25% of the total university electrical consumption. The incoming ASU project has a total capacity of 6.4 MWp; ASU’s share in this project is 1.5 MWp. This project will cover 100% of ASU’s electrical consumption by renewable energy