work progress in the PV power station.
The scope of work encompasses the labor and materials necessary to execute the
engineering, procurement, construction, testing, and commissioning of the plant on a
turnkey basis for a 6.4 MWp-DC photovoltaic (PV) power station, situated in Al- Sbaihi, Jordan.
The comprehensive tasks include, but are not limited to:
-Procurement of main BOQ items by the owner
-Site work, covering the installation of modules, structures, cabling, inverters,
transformers, switchgear, meters, monitoring and control systems, and security
measures .
-Installation of all MV (33kV) switchgear equipment
- Construction and commissioning of the control building
The PV generator section, comprised of poly-crystalline tier-1 Photovoltaic
solar modules mounted on a single-axes (East-West) tracker substructure
- The plant, organized into four modular blocks, each connected to two inverter
power stations. To optimize PV energy utilization within each block, the
power station is equipped with 2 inverters, each rated at 1 MVA